Technical progress report : advanced marine technology 1 February 1974 - 31 July 1974
Technical progress report : advanced marine technology 1 February 1974 - 31 July 1974
Date
1974-12-15
Authors
Hosom, David S.
Hays, Earl E.
Hess, Frederick R.
McElroy, Paul T.
Marquet, William M.
Porter, Robert P.
Spindel, Robert C.
Winget, Clifford L.
Striffler, Foster L.
Hays, Earl E.
Hess, Frederick R.
McElroy, Paul T.
Marquet, William M.
Porter, Robert P.
Spindel, Robert C.
Winget, Clifford L.
Striffler, Foster L.
Linked Authors
Person
Person
Person
Person
Person
Alternative Title
Citable URI
As Published
Date Created
Location
DOI
10.1575/1912/24666
Related Materials
Replaces
Replaced By
Keywords
Abstract
The navigation system previously reported on is currently (July 1974) being used by ALVIN in a study of Mid-Atlantic Ridge as part of Project FAMOUS. According to all reports the system is a most important factor in making the project successful so far.
Engineering design, construction and testing are the main efforts in the subjects summarized below with more detail later on.
Description
Embargo Date
Citation
Hosom, D. S., Hays, E. E., Hess, F. R., McElroy, P. T., Marquet, W. M., Porter, R. P., Spindel, R. C., Winget, C. L., & Striffler, F. L. (1974). Technical progress report: advanced marine technology 1 February 1974 - 31 July 1974. Woods Hole Oceanographic Institution. https://doi.org/10.1575/1912/24666