Broadband borehole seismic system integration tests : report of the system integration tests at MPL/SIO

Thumbnail Image
Date
1998
Authors
Goldsborough, Robert G.
Austin, Gary
Bolmer, S. Thompson
Jabson, David M.
Jonke, Patrick
Gould, Matthew R.
Hildebrand, John A.
Hollinshead, C. B.
Offield, Glen
Orcutt, John
Peal, Kenneth R.
Spiess, Fred N.
Stephen, Ralph A.
Vernon, Frank L.
Willoughby, David F.
Zimmerman, Richard
Linked Authors
Alternative Title
As Published
Date Created
Location
DOI
10.1575/1912/8086
Related Materials
Replaces
Replaced By
Keywords
Borehole gravimetry
Abstract
This report describes a series of tests performed at SIO/MPL, Point Lorna the week of 17 November 1997 designed to achieve integration of the Broadband Borehole Seismic System (BBBSS) in preparation for the OSN Pilot Experiment cruise on RN Thompson during January 1997. Representatives from all groups were present (see appendix A), with their respective parts of the system and support equipment. It was anticipated that these tests would result in the complete integration of the various components of the borehole seismometer system in preparation for the January cruise. The system would be assembled and tested following a plan (see appendix C) that would culminate in the fully integrated borehole seismometer being wet tested off the MPL pier.