Report of the five-day forecasting procedure, verification and research as conducted between July 1940 and August 1941
Report of the five-day forecasting procedure, verification and research as conducted between July 1940 and August 1941
Date
1941-11
Authors
Willett, Hurd C.
Allen, R. A.
Namias, Jerome
Allen, R. A.
Namias, Jerome
Linked Authors
Alternative Title
Citable URI
As Published
Date Created
Location
DOI
10.1575/1912/1052
Related Materials
Replaces
Replaced By
Keywords
Weather forecasting
Abstract
The present report is intended to cover fully the activities of the long-range forecast
project both at the Massachusetts Institute of Technology and at the U. S. Weather Bureau
in Washington, between July 1, 1940, and August 1, 1941. It includes all material
bearing on the activities of the current fiscal year which has appeared in the three progress reports that were written during the year. The report is in four sections.
Section I outlines the administrative set-up of the project and its transfer from the
Massachusetts Institute of Technology to the U. S. Weather Bureau in Washington, indicates
the general purpose of the project, outlines the program of routine synoptic and
statistical work which is maintained as a necessary part of the five-day forecast service, and lists the personnel which has been available to carry on the project.
Section II covers in some detail the five-day forecast procedure as practiced during the
past year, including one illustrative case selected and discussed by Mr. Namias. The discussion of the five-day forecast procedure is concluded with some remarks on the significance of the results obtained by the basic method and a summary by Mr. Allen of the success of the forecasts as shown by the statistical verification of the forecast temperature and precipitation anomalies.
Section III contains a brief discussion of each of the special investigations made during the past year which bear on the five-day forecast problem. For the most part, the results of these investigations were not obtained soon enough to be incorporated in the forecast procedure outlined in Section II.
Section IV sets forth recommendations for further theoretical, synoptic and statistical
research which is needed to develop and extend the five-day forecasting technique which has been developed by this project.