DSRV Alvin weight report, 1973

Thumbnail Image
Date
1973-12
Authors
Sharp, Arnold G.
Doherty, Kenneth W.
Linked Authors
Alternative Title
As Published
Date Created
Location
DOI
10.1575/1912/24590
Related Materials
Replaces
Replaced By
Keywords
Abstract
Weight and stability computations are presented for the research submarine ALVIN following the installation, early in 1973, of the new titanium alloy pressure hull built by the U.S. navy under "Project Titanes." Longitudinal and vertical components of the BG distance are shown for the vehicle in its normal submerged condition, and for a number of emergency conditions. Calculations for pounds per inch immersion and moment to heel one degree also are included. results of the post-refit dockside trials are presented and discussed.